RFP / Vendor Quote Library
Central subweb for current and future Technology Department RFPs, vendor quote packets, maps, attachments, and downloadable Word documents.
Back to Vegeta DocsEd Pastor School Gym Rear Projection Screen / Short-Throw Projector Installation
Installation of recessed rear projection screen in the stage T-bar / ceiling tile area, short-throw projector at the back of the stage before the solid curtain, electrical setup, low-voltage conduit pathways, and pathway/integration to the existing audio rack / A/V equipment area.
- School: Ed Pastor School
- Questions Due: 06/29/2026
- Target Installation Window: 3 weeks maximum after District authorization / purchase order
- Maps: Ed Pastor Gym Device Location drawing attached in Word document and available as PDF download
Arizona Desert School Gym Projection Screen / Projector Installation
Installation of 18-foot projection screen, projector on gym high ceiling, electrical setup, low-voltage conduit pathways, and pathway/integration to the existing audio equipment rack.
- School: Arizona Desert School
- Questions Due: 06/29/2026
- Target Installation Window: 3 weeks maximum after District authorization / purchase order
- Maps: Device Location drawing attached in Word document and available as PDF download
Gadsden Elementary School Gym Projection Screen / Projector Installation
Installation of 18-foot projection screen, projector on gym high ceiling, electrical setup, low-voltage conduit pathways, and pathway/integration to the existing audio equipment rack.
- School: Gadsden Elementary School
- Questions Due: 06/29/2026
- Target Installation Window: 3 weeks maximum after District authorization / purchase order
- Maps: GES Device Location drawing attached in Word document and available as PDF download